Language: Chinese line English
Tel: 0086-13508973211
SKYPE在线客服
sales@hengwanggk.com

News

Pile Driver Shipment to Mongolia

Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.

Oil province,is a common driver uses around half of a year can be a driver left money for you.

Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.

Crawler walking,high walking and climbing ability

The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.





CONTACT US

Contact: Mr.Wang

Phone: 0086-13508973211

Tel: 0086-13508973211

Email: sales@hengwanggk.com

Add: Floor 24 Block C,Haineng Internal No.6 Jinyu Road, Rencheng Zone Jining City Shandong Province

Scan the qr codeClose
the qr code